KP 3.0 UNLEASHED
RENEWABLE · REASONABLE · RELIABLE
KP 3.0
Investor Day · 30 September 2026 · Three scaled platforms. One defining ambition.
OUR COMMITTED TARGETS BY FY32
Three chapters
From a ₹1 lakh cargo business to a listed energy group.
Founded in Surat in 1994 by Dr. Faruk G. Patel. Solar and wind began as separate businesses; today's convergence (FDRE, RTC, storage) is recent.
KP 1.0
1994 – 2019 · Building the platform
- 1994Founded in Surat
- 2001KP Buildcon — engineering foundation
- 2008KPI Global Infrastructure — entry into solar
- 2010KP Energy formed for wind
- 2013First 15 MW solar park, Sudi
- 2015Own 66 kV line + first PPA
- 2016KP Energy IPO (BSE SME, ₹24 Cr)
- 2018KP Energy → BSE Main Board
- 2019KPI Global IPO (₹145 Cr)
KP 2.0
2020 – 2026 · Integrated developer
- 2021KPI → Main Board & NSE
- 2022Renamed KPI Green Energy; crosses 100 MW IPP
- Dec 23₹300 Cr QIP, 3x oversubscribed
- Mar 24KP Green Engineering IPO (₹720 Cr)
- Aug 24₹1,000 Cr QIP
- Nov 24KP Energy → NSE Main Board
- Sep 25₹670 Cr Green Bond — India's first externally credit-enhanced
- Mar 261 GWp energised; Asia's largest galvanizing kettle live
KP 3.0
FY27 – FY32 · Institutionalisation & scale
- NowBusiness structure realigned — one company per segment
- GovernanceBDO auditors, royalty caps, board strengthened
- Mar 27Target: release of promoter pledge
- FY28BESS assembly production begins
- FY29Cell production begins
- FY3210 GWp IPP · 10 GWp EPC · 10 GWh BESS
Corporate
KP Group, in their own words.
Group communication, the Chairman's vision and the NOC 3.0 film.
KP Group International Communication
Dr. Faruk G. Patel | Commitment | Vision for the Future
NOC 3.0
Media
Watch, read, see.
Videos and photos from the KP 3.0 Investor Day.
Latest updates
Press coverage — English
AMU celebrates birth anniv of founder Sir Syed Ahmad Khan; KP Group Announces to Establish A KP Excellence Centre at AMU With a Donation of Rs 5 Crore
KP Group Announces to Establish A KP Excellence Centre at AMU With a Donation of Rs 5 Crore
KP Excellence Centre to Be Established at AMU, Opening New Opportunities for Students in Renewable Energy
KP Excellence Centre to Be Established at AMU
Rs 272 Crore Orders! This Green Energy Engineering Stock Wins Contracts Across 3 Key Businesses
KP Green Engineering has received fresh confirmed orders worth Rs 272.32 crore, led by solar and
KP Human Development Foundation Featured in Wealth InTrust: CSR Good Book India 2026
Contributions in the field of Education
KP Group Raises FY32 Ambitions with KP 3.0, Targets 10 GW Each in Owned Generation and EPC
Renewable energy major KP Group, which has three listed companies-KPI
K.P. Energy to host 'KP 3.0 Unleashed' Investor Day in Mumbai
Announcement coverage of the Investor Day.
Press coverage — हिन्दी
KP 3.0 unveiled: Vision 2032 strategy gives a new direction to development
Mumbai coverage of the Vision 2032 strategy launch.
HindiKP 3.0 unveiled: Vision 2032 strategy gives a new direction to development
Coverage of the KP 3.0 Vision 2032 announcement.
Press coverage — ગુજરાતી
KP Group unveils Vision 2032 strategy, charting a new direction for growth
Coverage of the KP 3.0 launch.
GujaratiKP Group unveils Vision 2032 strategy, charting a new direction for growth
Coverage of the KP 3.0 launch.
GujaratiKP Group unveils KP 3.0 with ambitious FY32 renewable energy and battery manufacturing targets
Business news coverage of the FY32 targets.
GujaratiSurat-based KP Group launches KP 3.0 with the acquisition of two companies
Coverage of the launch and acquisitions.
GujaratiKP Group unveils KP 3.0 vision and major acquisition; targets 10 GW capacity by FY32
Business coverage of the vision and acquisition.
Business model & strength
Double engine: EPC + IPP.
EPC is capital-efficient — customer capital funds the build. IPP adds 25-year PPA-backed annuity cash flow. Together they fund project equity internally, growing the asset base without continuous equity dilution.
KPI Green Energy
Solar, hybrid, BESS & floating solar — IPP and EPC. Owns and operates assets on 25-year PPAs.
KP Energy
One of India's leading wind EPC players; 646 MW O&M; strategic 250 MW IPP (48.5 MW operational).
KP Green Engineering
Design, manufacturing and galvanization arm. 23+ engineered products; supplies towers and mounting structures.
All inter-company transactions are on an arm's-length basis.
Portfolio & execution
10.3 GWp renewable portfolio.
Across solar, wind, hybrid, floating solar and BESS. Company-wise and segment-wise breakdowns below are as on 30 June 2026.
IPP: 2.8 GWp total
Commissioned · 1.01 GWp (as on 30 Jun 2026)
Under execution · 1.81 GWp (as on 30 Jun 2026)
Gujarat home, national reach
131 sites in Gujarat. Beyond: NTPC REL 650 MWp BoS and NACOF Oorja 550 MWp EPC (Rajasthan), MAHAGENCO 128 MWp (Maharashtra), 42 MWp wind-solar hybrid (Karnataka).
Floating solar
142 MWp EPC order under progress at Kadana Dam, Gujarat. Estimated 102 GW potential across India.
In numbers
The scale, visualised.
Capacity by company
GWp · 30 Jun 2026IPP portfolio: 2.8 GWp
Commissioned vs under execution · split as on 30 Jun 2026 (2.82 GWp)- 1.01 GWp commissioned
- 1.81 GWp under execution
Revenue FY21 → FY26
₹ CroreIndia BESS demand
GWh · CEA National Electricity PlanKPI Green generation
Crore kWh · owned IPPBESS target revenue mix
% of revenue · none above 30%
KP Green Engineering
Engineering & manufacturing at scale.
Credentials
NATRAX — only company to pass all W-Beam & Thrie-Beam crash tests first attempt · RDSO approved · ISO 9001/14001/45001/3834-2 · 1,280 BSNL sites.
Under development
Onshore & offshore tubular towers, hot rolling mill, container manufacturing, cables & conductors, aluminium extrusion, magni-coated fasteners, defence products.
Matar, Gujarat
~55-acre manufacturing footprint. Design → precision engineering → galvanizing → on-site delivery, under one roof.
Sun Drops Energia
10 GWh: from cell to system, on one Gujarat campus.
Led by Erez Schreiber, CEO – BESS (founder of 3D Battery, ex-head of Elbit Systems' Energy & Power). ~110 acres with RED permission.
Why build the cell
The cell is 55% of container cost. Making it lifts gross margin from 14% to 22% at an unchanged price (~$10/kWh gap). 90%+ of Indian BESS cells are imported from China, locking 60–80 days of cash.
Five chemistries, eight markets
LFP in production 2027; NMC, sodium-ion, solid-state, Li-S in the roadmap. Target mix: utility BESS 30%, industrial 18%, renewables 14%, mobility 11%, telecom 9%, defence 8%, micro-utilities 5%, exports 5%.
Demand
India BESS demand (CEA): 35 GWh FY27 → 236 GWh FY32 → 1,840 GWh by 2047. Under 5% of cells consumed in India are made in India.
The market behind the roadmap
India needs ~55 GW of non-fossil capacity a year.
That gap is the opportunity for renewable generation, storage and firm & dispatchable power. CERC and GERC trading licences let KP monetise surplus IPP generation — peak IEX prices of ₹12–15/kWh vs ₹3–5 off-peak (illustrative).
Global expansion & green hydrogen
Beyond India, beyond power.
Africa & GCC
- Botswana: Phase 1 of 500 MW planned; 500 Ha land allocated; Gaborone office open
- Tanzania: power infrastructure under BOO model
- Zambia: EPC support to a local developer
- Saudi Arabia: EPC and export of engineering solutions
Green hydrogen — KPI Green Hydrogen & Ammonia
- 1 MW electrolysis plant at Matar, 432 kg/day
- 6 EV & H₂ fuel stations in pipeline; vision of 500 across 6 corridors
- 1 TPD waste-to-H₂ EPC project for NTPC
- 10 patents filed, 17 MoUs, 31 NDAs
- Not a subsidiary of any KP Group listed entity
Governance
You spoke. We listened. We acted.
| Area | What you told us | What we did | Status |
|---|---|---|---|
| Business structure | Overlapping businesses | One company per segment and project size (Sun Drops ≤50 MW, KPI Green >50 MW solar, KP Energy wind) | Completed |
| Promoter pledge | 45% of promoter shares pledged in KPI Green | Bank sanction terms provide for release by FY27-end | Target Mar 2027 |
| Royalty | Uncapped outflow | Lower of 2% of revenue or ₹175 Cr (KPI), ₹100 Cr (KPE), ₹75 Cr (KPGE) | Ceiling affixed |
| Statutory auditor | Need a reputed firm | BDO appointed for all three listed companies, FY27–32 | Completed |
| Board | Broader, more experienced | New appointments; leadership depth added | Completed |
This is a first step — not the last.
Investor presentation
The full KP 3.0 story.
Read every slide presented at the Investor Day, with the speakers, targets, financials and governance commitments.
- Event: KP Group Investor Day — 30 Sep 2026
- BSE: 542323 · NSE: KPIGREEN
- Filed under: SEBI Regulation 30
- Data as on: 30 June 2026